Currently almost all employees in Qatar require sponsorship. Employees are not allowed to work for anyone other than their sponsor even on a part-time basis. In practice this rule is often broken, although doing so is sufficient grounds for cancelling a work permit.
Employees cannot normally transfer sponsorship unless they have worked for their employer for two years. They will also need a clearance letter from their sponsor in order to do so. A sponsor can ban a departing employee from returning to the country for two years.
Sponsors do not have the right to keep the passports of their employees except to perform official business, unless it has been agreed in writing between both employee and employer.
Employees who are sponsored can in turn sponsor their own families. Fathers can sponsor their sons as long as they are under the age of 25 and are students, and can sponsor their daughters until they marry.
Workers can not leave the country without an exit permit, although minors and wives may do so.
After a residence permit is cancelled, an employee can not return to the country for two years, even as a tourist.
Women
Women seeking work in Qatar who are on a family sponsorship do not need a separate work permit. However, they must register as a working woman at the Labour Department. To do so they must have to have the permission of their sponsor (in the form of a signed letter). While women are entitled to the same pay, training and promotion prospects, they are not allowed to undertake hazardous work. After a year’s employment women are entitled to 50 days paid maternity leave. A women may not be dismissed because of marriage.
According to the sponsorship law issued in 2009 women can sponsor both husbands and children.
For more information see: Working Women in Qatar
Contracts
Employment contracts must be drawn up in Arabic. While a contract may be translated into another language, where there is a dispute over translation the Arabic version will always prevail.
One copy of the contract must be given to the employee and one to the employer, while a further copy is kept at the ministry of Labour.
Dismissal and Resignation
During the probation period of a job – which can last up to six months – an employee can fired with three days notice. Otherwise either the employer or the employee can terminate a contract without giving reason; the period of time required varies depending on the length of service and how the employee is paid, but can be anything from a week to two months.
Disputes
Disputes between companies and workers can be referred to the labour department. If the labour department cannot resolve the problem it will be referred first to a reconciliation committee and the to an arbitration committee. In the event of being dismissed an employee may be able to appeal to the lab our department, but must do so within seven days of receiving his or her dismissal.
If you have a complaint you should contact The Labour Department:
Tel: +974 4406554
Fax: +974 4406556
Located on C ring road - heading towards Hamad Hospital you'll find them close to the traffic lights at New Slata (the traffic lights before Ramada signals).
For a serious issue, contact The National Human Rights Committee:
Tel: +974 4444012
Fax:+974 4444013
Email: nhrc@qatar.org.qa
Website: www.nhrc-qa.org
Contact Form
Location: Salwa Road, close to the Qatar Tribune office and the Jeddah flyover.
Working Hours
48 hours is the maximum amount of time a employee may be required to work under Qatar labour law without the payment of overtime. Normal working hours consist of eight hours a day, six days a week. However, during Ramadan these hours should be reduced to 6 hours a day with a maximum of 36 hours a week. Working hours should include at least an hour for rest, eating and prayer. Even with overtime, employees should not work more than ten hours a day.
Part Time Work
Until recently employees were not allowed to take on additional work outside their primary job. This has now changed, and workers can now take on additional part time work if they have the permission of the sponsor.
Holidays
Employees are entitled to a minimum of two weeks leave a year. Expatriate employees must be provided with an air ticket at the end of their contract. Friday is a designated holiday, and a worker should never be required to work more two consecutive Fridays. Workers are also entitled to leave with full pay on Eid Il Fitri, Eid AlAdha, Independence day and three other non-specified days. Muslims are allowed two weeks of unpaid leave to perform the pilgrimage.
Sickness
Workers are entitled to two weeks sick leave on full pay and half pay for another four weeks, after which they are not entitled to any further pay. After 12 weeks of sick leave the employee can be dismissed.
Labour Unions
Labour unions are only allowed for Qatari employers.
Further Information:
See Qatar Labour Law on Qatar Embassy
For Questions or Discussion check out our Qatar Forum.
|
Leave a comment
Comment by nikhil marokey, 6th February, 2010
i was working in ccic qatar as qc inspector from dec 27 2008 to march 2010. my visa is cancelled at the time of returning.i was demobed because of redundancy. i have no N.O.C .i need to know that wether i am eligible to work in qatar now, is there any ban left for my entry? i am looking forward for a reply
Comment by Juan dela Cruz, 1st February, 2010
Good day! I don’t have enough courage to reveal to you my real identity for I am afraid to be kicked off from the company I am working. I have many mouths to feed and plans to realize. I read some lines from the labor law and I found out some violations of my company based from it. One of this some is the working hours. I had signed a contract of 8 hour working basis per day and beyond from it must be paid but since from the start upto present we are receiving a fixed salary. Everyday we are working 10 hours and 2 half Fridays a month and even in special holidays. There's no problem for us if we will be working even every Friday as long as we are paid. At this time, we are afraid to make any absent in Friday because our project will be finished this year and they will be starting to demobilize their people by next month. Maybe they will make this as a ground of kicking us out from the company. This is just one of the SOME problems we have. Will you please examine our company, GAMA Qatar?
Hoping to keep any ways of revealing my identity.
Thank you.
Comment by Harold Guzmana, 27th January, 2010
I am a storekeeper in AMWAJ CATERING
SERVICES, after finished contract, do I have the right to ask for an NOC????
Comment by Solomon Regudo, 26th January, 2010
I am an engineer and worked with a company in Qatar until I completed the project for about one year. I was demobilized on December 27 2009 after the completion of the project. I asked for NOC from my employer but they refused to send it to me. Does the employer have the right in withholding my NOC?
Comment by Norman, 22nd January, 2010
Good Day! My Name is Norman I am currently working as a food server in one of the casual dining here in Qatar, I would like to know if you are working in a restaurant is it allowed the the employee is working 10 to 12 hours per day? because almost everyday this is our time during weekdays we where picked up at the accomodationin the morning its 7:30am we will arrive at 8:15 and we will be dismissed until 6:00 pm until all the closer will came in, and in the evening shift the pick up time is 3:00 pm we will arrived at 4:00 pm and we will be closed at 1:30 am until 3:00 am,and we are only allowed to have a 30 minutes break the whole shift and after that the break room will be closed, I would like know if this is allowed by the Qatar Labour? thank you very much I hope I get a nice feedback from you Im really concern about the health of the employee because theres a lot of employees getting sick. thank you very much
Comment by kamdev, 19th January, 2010
Dear Sir/Madam
I’m Nepalese. I’m working at Qatar.
At Nepal I got the job offer letter mention about the receptionist, 1,500Qrs. Basic of salary and 200 Qrs. Food allowance including overtime I suppose to get 2,500 Qrs. And according to me Basic salary means 8hrs of work. I used to work 12hrs at hotel. But I couldn’t get my overtime, I mean 4hrs of works this I mentions each month to my boss. And in my receipts I used to get basic salary of 750Qrs and other 4hrs overtimes in total I used to get 1,700Qrs. After 8 month because of business crises Hotel was sold to another Owner, Though 3 of us lost our job. Afterwards our boss let me Sign on another contract and they give me two choice go back to Nepal or work as security. But I asked for Non objection letter (NOC) from the company because I was paying Loan which I took at Nepal and still I’m paying. But my company did not give me NOC letter so that I don’t have a choice and I did the sign into new contract. Now I’m working as a security because they told me that they don’t have a job for me. And my company is paying me 1,400 Qrs. In total. From then each and month I’m asking for NOC letter but I don’t have any replies. I don’t want to work as security and it is not my profession too. Only matter is that I must pay my loans. Because of this I lost my time, experience and my wages. I wants NOC letter so that I can work for other company. Is there any chance that I can get NOC Letter from the company and I can work freely? Does Qatar Law give me chance to live and work at Here in Qatar? Is there any chance that Qatar Labor court provides me NOC Letter?
You’re Scenery
Kamdev
Comment by Sam, 16th January, 2010
I am a Civil Engineering having more than 10 years experience in the field of construction. I am geeing an appoinment in Qatar. I want to stay with my family including elderly parents. Is it possible and how. Please let me know.
Comment by hr&ADmin, 5th January, 2010
what happens if a company asks its employees to work more than 48 hours a week.
Comment by eric, 4th January, 2010
sir/madam.. i currently hired from the company, december 16 i received my offer letter the problem is i am free lancer and i stay here in doha qatar for 7 months kindly would like to ask it may posible transfer my visa(free lancer) to company visa because i really want this job. pls advise me sir/madam
Comment by Kumar, 30th December, 2009
I have finished my 3 years in my company and i want to get a relies and go to a enother job but my current company as announced a new policy, that they will not give NOC to any staff in future but they gave before but now they stoped giving NOC. so i need to know is their any rights to the employer to stop giveing NOC.
Comment by mariamme, 28th December, 2009
to adrian..no one can take your passpot...even your sponsor..that is based on Qatar Law 2009.
Comment by Rehan Ansari, 14th December, 2009
As per the labour law for the safeside of employer,kindly suggest about the bonus and leave salary as the years completed.I've already completed 5 years, what can I claim my early bonus even i'm getting my leave salary early as i go vacation.
Comment by jana, 5th November, 2009
is it true that if you are a local hire you still have a ban.. because i'm a local hire but we sign a QR5000 ban in our company.. and we are working 10-12hours a day without overtime payment.. and our salary is QR1241..
Comment by Adrian, 28th October, 2009
I went here in Qatar carrying a tourist visa but my sponsor won't give me my passport in exchange of so-called guarrantee money. My visa will expire today but I have an employer that guarantees me they will hire me and slso will pay for the penalty charge to immigration. What do you think about my case? Is it appropriate for my sponsor to witheld my passport though they already issued an NOC? Need your help.
Comment by Adrian, 28th October, 2009
I went here in Qatar carrying a tourist visa but my sponsor won't give me my passport in exchange of so-called guarrantee money. My visa will expire today but I have an employer that guarantees me they will hire me and slso will pay for the penalty charge to immigration. What do you think about my case? Is it appropriate for my sponsor to witheld my passport though they already issued an NOC? Need your help.
Comment by Jana, 22nd October, 2009
I am working for 8 years now in one beauty center and i like to leave my job for good what are the benefits that i can take and when i gonna submit my resignation letter.I am planning to leave this april 2010. And pls. give me the number of the labor department where in i can consult my case.
Comment by anna, 19th October, 2009
I would like to know more about the minimum salary for an overseas filipino worker. Does the company has its rights to decide certain amount of salary they want to pay for their employee with in the contract regardless with the qatar labour law.
Comment by Michael Mason, 16th October, 2009
How do I lodge a complaint regarding suspected contract violations if I am no longer in Qatar?
Comment by Fil, 14th October, 2009
I finished my contract with my employer and now I want to transfer under my husband's sponsorship, but my employer said no. Does he have the right not to give NOC?
Comment by BA, 13th October, 2009
I am currently working in Qatar on a residence visa for a contractor on a U.S. military base. At first the payroll was being done by the sponor company until the contractor saw how much it was paying us. After that they quit letting them do the payroll and did it themselves, which in turn is much less. I than had to sign a new contract which there was never an Arabic version nor do I have a copy. Also, I am not getting paid correctly according to Article 66,73,74,75, and 78. Could you please advise me on what I can and can't do and need to do. Thanks
Comment by ahmed, 11th October, 2009
Qatar law most subject very good. Some people salary very low. Please consider for them parttime work without sponsor permission. Because most of the sponsor not giving permission. And also sponsorship system can be make easy as Baharain & Kuwait.
Comment by jhojho, 4th October, 2009
gud eve,i am a technician from one company here in qatar.i have 2 yrs contract,and arrive here in qatar on 20th of june 2009..since june til now my company does't give us our salary on monthly basis,and nw we are still waiting for our salary for the month of august and sept. can you pls give me some advice and helping hand to resolve my promblem from my company?thnk you
Comment by Raghupathi, 4th October, 2009
Qatar Laws are very good and good clarity is there. But one more thing is required that there is no clause or statement regarding emergency holidays. Here more are expatriates, if anything goes wrong in their home country/parents /family the employee has to rush his hoem time but many companies are not giving any EMERGENCY OR SPECIAL LEAVE, whcih needs to made asa a Mandatory requirement but without any expense to the emmployer, under humanitarian ground.
Comment by Mustafa, 26th September, 2009
I leave Qatar six month before, I cancel my Residence permit, Now I got an good job again in Qatar, is it possible to get again Residence permit or it is prohibited? please advice me
Comment by albert, 25th September, 2009
Hello,im working here as mechanical engineer in mep company and i signed 2years contract, after 18 months, my company have no new project,and my employer decided to terminate my contract this coming october. my quetion is can i get my
remaining months salary as per contract i signed or i have right to ask my 4 months salary balance as per my contract signed ? Please give me advice, what im going to do if my employer not give my 4 months balance salary ?
Comment by Janah, 22nd September, 2009
I am working for 1year in my employer, I go home in my country and coming back after few months, my employer plans to cancel my visa..is it true that they can cancel my visa after 6months from the time i leave qatar?Can I stii go back in qatar after 2years of cancellation and find a new job with asking NOC from my previous employer?Please do advise. thanks
Comment by josh, 10th September, 2009
our company not paying our holiday, instead they give us extra day off as payment..is that right? i have just read the law regarding the holiday that we are entitled for full payment during holidays,, is our company having violation? please advise.
Comment by Rs., 10th September, 2009
sir, im working in an electronics marketing company.i compleet 3years.
2months ago i come back after vacation.
now i have to resign my job because overload.so what benifit i will get,i have 10 hours work daily,monthly 1 some times 2 friday off.
Comment by daku, 6th September, 2009
gud day to you, iwant to resign after a year of work in my present compny. what benefits will i received? how long will i be banned from coming back? if my new employer offered me a business visa, can i work right away?
Comment by JAY, 2nd September, 2009
I went for vacation last July without leave salary because I was promised to recieve it when I come back.But unluckily my company now refused to give me,because our manager said they are not really giving.But the previous employees who went for vacation recieved their leave salary.Please I need help for my rights.I know my company will cancel me if I will complain to the Labor Department.Please I need some advise.
Comment by jomarie, 25th August, 2009
HI IM WORKING HERE IN QATAR FOR ALMOST SEVEN (7) MONTHS I JUST WANT TO ASK IF THERES ANY REVISED VERSION OF QATAR LABOUR LAW BECAUSE WE ARE REFFERING TO A 2004 LABOUR LAW ITS ALMOST 5 YEARS NOW SPECIALLY THE ARTICLE 76 THAT GUARDING AND CLEANING POSITION ARE EXCEPTED TO A 36 HOURS WORK INTIMES OF RAMADAN..PLEASE REPLY THANKS.
Comment by edward sevillano, 11th August, 2009
is it true that you will get your gratuity after 5 years of working here in doha?
Comment by Raghu Nair, 11th August, 2009
how to calculate an employee for obtain bonus?
Comment by Vilma D. Tandingan, 4th August, 2009
I am under my husband's sponsorship with residence visa. I applied as a nurse in a private clinic and my employer asked me to sign with her a 6 months contract agreement.Will I be allowed to apply for another job even if my employer does not give me a No Objection Certificate after my 6 months contract? Is it legal for my employer to ask from me a penalty equivalent to my 2 months salary if in case I do not finish my contract agreement with her?
Comment by ELLA, 4th August, 2009
Recent comments
Cancelling a visa - Is it possible?
chand's picture
By chand on Sat, 01/04/2006 - 12:24pm
Hi Friends,
I have been reading the notings in this website for quite sometime. I was due to arrive Doha by this week, but it has got postponed.
What happened is like this: I had agreed to join a company there & they have prepared my work visa. Just after that I got another offer from another company in Doha for a much bigger amount. I wanted to take the 2nd offer & have requested the 1st company to cancel my visa. They have reluctantly agreed but I will have to reimburse their expenses.
Can someone who is aware about local laws & visa regulations, may advise me whether it is possible to cancel my visa by the 1st company & then the 2nd one applies for it afresh? Or is there a waiting period in between? I have not yet traveled to Qatar & my passport has not been stamped consequently.
I will be thankful for some serious advice from any well informed person.
Comment by Seid, 3rd August, 2009
I work on my company for one year my company wants increase my salary so my labour agrement shall i apply again with my new salary or just work until my first contract end?
Comment by shaik khaja moinuddin, 1st August, 2009
Sir i am pharmacists with clinical pharmacy i have clear qatar pharmacy exam in april 2009 according my contract my sponser will pay me 6000qr after pharmcists licensed. but NHA not issued me license because my visa is Accountant i told my compy to change my visa but still they have not changed and not giving me salary from last two months please what i have to do
Comment by sharmila, 30th July, 2009
one of my freind came to work as driver in qatar. but the company is not good. so he didnt make any finger print or medical test. in this matter can he comes again qatar
Comment by praphul kumar, 28th July, 2009
I leave qatar in may 2007, and my visa is valid till feb 2008, also that time my visa was not cancelled because i leave emergency ,may i know now i can join another sponsor in qatar please suggest me soon.also it is more than two years.
Comment by Muhammad, 26th July, 2009
hello, im working here in a contracting company almost 3mnths.. My visa is processing, i have finished my blood and finger test, i need an emergency leave for 10days but my visa is not yet stamped in my passport because my GM is not here.Next week i want to attend my sisters marriage, how can i go.My GM is coming after next week only.So without stamping in passport,how can i leave.
Comment by Red, 19th July, 2009
I am engineer here in qatar already 1 year & more than 1 month to my company. I would like to ask what if i resigned and my boss don't want me to go what will i do regarding to this matter.Please advice.thanks!
Comment by Liza, 18th July, 2009
I worked in qatar for 2 years.then i resigned and left the country on august 2008 but my visa was still valid till october 2008.my sponsor didnt cancel it from the time i left.is it possible for me to go back to qatar this year 2009, or should i ask for an NOC from my previous sponsor enabling me to go back and work again. Kindly advise me as i am planning to go back to qatar the soonest...thank you for the assistance.
Comment by Andrea, 17th July, 2009
I am a British Citizen, relocating to Qatar over the next few months with my husband and 3 children. I have been told that there is a new Sponsorship law where a woman can sponsor her husband and her children. However I often get told that this is ok in theory but NOT pactise. Is this true? Are there any particular circumstances that would benefit my case? Please advise!!!!
Comment by georgebibi, 16th July, 2009
being an engineer i am forced to work 12hrs per day by my employer with out any overtime payment. as per agreement only 8 hrs need to work.why labour dept. of qatar not investigating this.if i am going to complain i may loose my job. i would like to know what can i do
Comment by habs, 13th July, 2009
I will finish my 1 year with my employer and I have an open contract. I don't want to renew my visa with them. Is it possible I can ask for release? and if they don't give me, would they provide me with my ticket to go to my country and give me my end of service benefits? and when can I go back again here in Qatar?
Comment by abc, 2nd July, 2009
i am an engineer working in a construction company.i already have a work visa in qatr.can i do a job in other GCC countries without cancellation of the visa here.if i cancell the visa what will be the ban period.also please give me the details of the NOc.thanks
Comment by ann, 30th June, 2009
I enter in Doha under tourist visa. Before it lapsed I bought a visa from one company here. They advised me that I can transfer my visa when I found employer before 3 months. I was luckily found an employer and I was hired in the company, I only gave them NOC at that time. I am 9 months in this company and due to personal problem I need to go back to my origin country. When I talked to them and asking to give me release they told me that they cannot give NOC. Is it possible to get NOC from my employer since I only gave them NOC before? Is there any possible way or can I demand NOC from them? Please advise me. Thank you very much.
Comment by HUMAN, 28th June, 2009
IS IT LAWFUL IF YOU DONE A MISTAKE LIKE YOUVE MISSED TO ANSWEAR THE CALLS FROM YOURE MANAGER, THEN THE PUNISHMENT IS TO HAVE A SALARY DEDUCTION?
Comment by warren d. antonio, 27th June, 2009
I have been working in qatar as per my contract it was 1year and it's defend on me if i will renew the said contract,to make the story short after i finished my 1year i decided not to renew the said contract know i want to know if my employer have the right to impose a 2years ban on me?because i am planning to return there.thanks and more power!
Comment by Rahan Ansari, 23rd June, 2009
As per the labour law for the safeside of employer,kindly suggest about the bonus and leave salary as the years completed.I've already completed 5 years, what can I claim my early bonus even i'm getting my leave salary early as i go vacation.
Comment by tintin, 22nd June, 2009
my husband is working in Qatar for almost 7 months but recently his having a problem with his company because "his been working for 10 hours a day and his driving a truck,which is not stated on his contract as per his contract " he will ONLY work or 8hours and will drive ONLY a car. Now my question is this RIGHT?? please advise..
Comment by Rofie, 15th June, 2009
I've been working in this government firm, 3years contract and I got new contract for 1 year. My question, was that I was asked to get my husband certificate of what are the benefit he is getting from his sponsor (company), for example yearly ticket as well as the Private Insurance health card.
My husband is working not in Government firm, I will do understand if my husband is working in government, I don't have complain if I dont get this benefit.
Another things, I been hearing that what ever the wags getting of the employed husband,wife will get too. like where I am working, I am getting only my basic salary + transportation.
Please, I would like to verify all the above mentioned if its all legal.
Thanking for advance.
Comment by Ronald P. Teves, 10th June, 2009
I've been working here in Qatar for more than a year,my concern is, is the Qatar Labor Law mandates all companies to cover thier employees with the accident and a health insurance?please let me set an example.From the company accommodation to the work place, company provides the transportation for it's employees.So happened that the car being then used was a van with three(3) seating capacity only and it caries five(5) persons on board when it encountered an accident.Do the two(2)other passengers can be covered by the insurance?
Comment by rex, 4th June, 2009
May I know the rate or equivalent computation regarding over time work as per qatar labor law if the employee work for an OVERTIME during regular days and even HOLIDAYS or Friday. Thanks!
Comment by mel, 3rd June, 2009
my iqama is already expired since april,they will renew if stay in the company. I am planning to resign this june 2009 & they will give me an NOC but they will cancel me.I'm been worked for the company more than 3yrs & i am local hire also.Can i ask if have a right not to cancel me ,i only need is NOC & transfer my visa to other company,IT is possible?pls answer my question as soon as possible before i give my resination & before cancel me...thanks
Comment by MOHD SAJID, 2nd June, 2009
MY WORK VISA WAS CANCELED ON 8 JUNE 08 WHICH WAS VALID TILL 10 FEB 09. NOW I HAVE OFFER FROM OTHER COMPANY. I WANT TO KNOW THE BAN PERIOD FOR ME IN QATAR
Comment by papa johns staff, 2nd June, 2009
May I know the rate or equivalent computation regarding over time work as per qatar labor law if the employee work for an OVERTIME during regular days and even HOLIDAYS or Friday. Thanks!
Comment by Hala, 27th May, 2009
I have worked in Doha for three years now as a teacher. My contract is a yearly contract. If I choose to resign and ask my sponsor for a release and a No Objection Letter (to work in another organization)-can my sponsor decline because he/she feels like it. OR is there something in the law that protects me and garantees that as long as I haven't signed a new contract, and give my employers a month's notice, that they MUST grant me my release without beating around the bush and also grant me a no objection letter. I am worried that the decisions they make behind my back are personal and manufactured. Waiting for a reply. Worried and desperate!
Comment by Salleh, 12th May, 2009
I'm an engineer working with construction industry, after working 16 months my project is near to an end. Since the company i work do not have any project ahead, my contracts is terminated. My question is do the banned of 2 years still arise to me ? Thanks
Comment by Jam, 7th May, 2009
hi! I've been working in an orzanization for about a year now. But I never sign any contract with them since my employment, because im local hire father-sponsor. and from what i heard they will not give NOC when I resign. i hav plan to resign before my 1 year, what am I entitled to with regards to payments...
Comment by Mr Biswas, 4th May, 2009
Dear Sir/Madfam,
I went to Qatar for a job and stayed there months (from January 2008 to 22-April-2008). I travelled Qatar with 'Work Visa-One Visit Type'. However I left Qatar about one year back (i.e. on 22-april-2008) and I told my employer that time for my'visa cancellation'.
Now please ADVISE me :
1. when I will be eligible for a new Qatar "Work Visa (Employment visa).
How many months I habe to wait to get a new 'Qatar Work Visa' as per current visa rule.
2. Also suggest me - if I want to come in Qatar again with 'Employment Visa' but with 'different sponsor (employer' - then what is the minimum requirements and How many months I have to wait to come again in Qatar but with new sponsor (employer).
Please ADVISE me.
Comment by syed ibrahim, 2nd May, 2009
I am working in dubai.i got a job in qatar now. i coming to qatar on 10th may09 without cancelling the dubai visa. is there any problem in qatar immigiration? can i get work visa. any requirement of police conduct certificate. pls helep me ...thanks
Comment by Maria, 27th April, 2009
Can I change job if i resign during the probation period. Do we require an NOC
Comment by robbie, 15th April, 2009
hi. im working in class contracting company here qatar, under qatar labor law 8hr maximum a day, why we work 10 hrs a day, without paying our overtime. im 1 year now in the company. what your recomendation to this issued? this is a violation of the law.
Comment by suman, 11th April, 2009
I am a driver here in qatar.my company wants me to send home with the group of other people but i want have release from company.company is rfusing to give release. is there any legal way through which i can motivate/inforce provide me a release or no objection letter? my termination is decided only due to economy reason of company, not due to any other charges.
Comment by reden rayla, pme, 9th April, 2009
may i ask what is the maximum no. of months that employer is subject to stoppel rules related to the granting of vacation leave for each employee.
my case dispermit me to go on leave due to inavailability of personnel to replace me in my capacity.
reden rayla
sr. mechanical engineer
Comment by glenn, 9th April, 2009
I finished my one year contract and my employer did not renew my contract for another year. My question is can my company give me NOC since they are the one who no longer needs my services which i asked from them and they told me that they will not give me NOC. So this means we will stop eating because we are not givin a chance to look for another job.
This is whar I want to know because I will be living this 14th of April for home. Thanks..
Comment by rey, 28th March, 2009
am been working for two years in my campony,last year i take may emergency leave because of my father condition he is on hospital,so i need money to go to philippines but my employer they not gave my salaries and overtime,after when i come back they gave to me..why they had to hold my salaries and overtime? i hoping some reply message from you. thanks
Comment by subash, 23rd March, 2009
i have been worked in a local company for 14 months and now i have get a job in qatar aviation service and i have already get NOC paper from my company is it possible to change the sponser or not please email me in my id [rajsubash36@yahoo.com]
Comment by Joy, 19th March, 2009
Sir, My sister is working in Qatar and she is having the visa. She is having a child aged 6.5 years old. Two weeks back I read in the news paper that working women can sponsor her child and husbant. Is it possible her to sponsor her 6.5 years old child.
Comment by chel, 11th March, 2009
i was bought to the deportation office by the CID during duty hours.it is because the company where i work now and my sponsor is different.it is clear that the company has liable for my detention.what i want to ask is that do i have the right to file any case to the company for that traumatic experienced?and one more thing we were the one who pay for our ID. is it right?
Comment by ZEB, 11th March, 2009
i just want to know who will be the one to pay our "iqama" o the ID? is it the employer/OR THE EMPLOYEE?
Comment by boyet, 8th March, 2009
Salam! pls tell me of whether there is a truth on the feb 26 issue of uae daily news and feb 27 issue of kuwait news agency regarding the new qatar labour law. It says that foreig labours have been allowed to transfer their sponsorship to the interior ministry without prior consent of the local sponsor. Is this true? wassalam
Comment by Prasad, 5th March, 2009
dear sirs.i have a residency visa stamp in my passport from UAE, now i got another job vacancy in qatar as a civil foreman, i can keep my uae visa and stamp qatar residency visa in my passport?
Comment by ziyad, 1st March, 2009
i was wprking here in contracting company as a draftman.i have here good opertunity in other company.now my sponcer is my company,if exit from here.can come agin here within 1 month ,please you will give answer for me . thank u
Comment by Rakesh, 27th February, 2009
i was in qatar working in work visa, due to some problems with my company i cancelled my visa on the day when it was expiring. can you pls tell me how long i am banned to enter to qatar while i have cancelled the work visa. Is it 6months or 2 yrs
Comment by riyad, 22nd February, 2009
dear sirs.i have a residency visa stamp in my passport from UAE, now i got another job vacancy in qatar as a civil engineer, i can keep my uae visa and stamp qatar residency visa in my passport?
Comment by ronnie, 21st February, 2009
Sir, i am working here in doha for 8months now and i am local hired here in doha. its possible to my company to give me Release/NOC if i decide to transfer or find a new job here in doha? because i went here as tourist visa before and i applied and worked here as local hire..please send me a reply. Thanks
Comment by Hashim, 19th February, 2009
I would like to know calculation of qratvity for employees
Comment by ANONYMOUS, 18th February, 2009
I AM WORKING HERE IN QATAR IN A CONSULTING FIRM FOR ALREADY FIVE MONTHS CAN I TRANSFER MY WORKING VISA TO FREE LANCER VISA AND CONTINUE WORK HERE IN QATAR. TNX AND NEED REPLY
Comment by sudhir, 17th February, 2009
Sir, I completed 1 year with Gs-daewoo cnstructios,then I resigned the job on june 27th 2007 and went back to india.Now my present commpany in U.A.E transfer me to qatar projets.now I can enter in to the qatar or not please send reply.thanks
Comment by sudhir, 17th February, 2009
Sir,
I completed 1 year with Gs-daewoo cnstructios,then I resigned the job on june 27th 2007 and went back to india.Now my present commpany in U.A.E transfer me to qatar projets.now I can enter in to the qatar or not please send reply.thanks
Comment by metroaxa, 10th February, 2009
I am working now for a company as a develpoment manager and for the last two months my boss Jassim Faysal has not given my salary and he always find an excuse and alibi to leave once confronted with regards to my salary,i am not under his sponsore im w/another sponsor what can i do to get my hard earn salary for two months?? Thank you
Comment by metroaxa, 10th February, 2009
Comment by Edward Ong, 8th February, 2009
Can an existing UAE Residence Visa will conflict my application for a Qatar Working Visa? thank you and good day!!
Comment by Mike, 28th January, 2009
my husband was working for 3years in his company and he resign last Nov.08. His company refused to give NOC, Is it possible he can come back after 2 months under visit visa which i will provide? Please respond, thanks..
Comment by louella, 17th January, 2009
Im 2 years and 3 months in my company when I decided to resign... When I ask our Director regarding my end of service benefits, he told me that I do not have anything to get because they gave me release, only they will give end of service benefits to the employee that they cancelled the visa...And one thing more they are telling that they are not the whose giving my salary only they are my sponsor...because Im working in a construction in consultant side, Im company sponsor but the contractor they are the one whose giving my salary not my company...please advice me what Im going to do...Thanks
Comment by louella, 17th January, 2009
Im 2 years and 3 months in my company when I decided to resign... When I ask our Director regarding my end of service benefits, he answerd me I do have anything to get because they gave me release, only they will give end of service benefits to the employee that they cancelled the visa...And one thing more they are telling that they are not the whose giving my salary only they are my sponsor...because Im working in a construction in consultant side, Im company sponsor but the contractor they are the one whose giving my salary not my company...please advice me what Im going to do...Thanks
Comment by Mohammad Raed Abbara, 11th January, 2009
Comment by ronald, 10th January, 2009
i filed the case in the supream court againts my company & they cancelled my visa last 2007. now the case is finished & now my banned is finish for 2yrs & im still here in Qatar without any job.NOW is it possible to i get a visa or new sponsor?without any NOC or release letter from previous cmpny because my Banned was finished for more than 2yrs.Pls reply
Comment by QV, 9th January, 2009
Can I just remind everyone that this is for comments - for questions and discussion please go to our forum: www.QatarChatter.com.
Comment by OFW, 9th January, 2009
May I know the rate or equivalent computation regarding over time work as per qatar labor law if the employee work for an OVERTIME during regular days and even HOLIDAYS or Friday. Thanks!
Comment by Jagan Mohana Rao Kosanam, 31st December, 2008
I worked in Qatar from Sep'2007 to 11th Jan'2008.I resigned and cancelled my VISA.May i join in other company now? i am not taking NOC from previous company. Please advise how to enter QATAR in any new organisation?How many months i am having BAN after canceled my previous VISA.Please send reply sir.
Thank you sir
Comment by Sonny Mantaring, 29th December, 2008
ive been working on a coffee shop here in doha for more than three years now.and ive been planning to apply for another job.is it possible to get NOC from my previous company?qatar labor says ican now transfer sponsorship as long as i finished two years or more.was it my company rights to never give NOC to its employee who finished 2 years or so?was it the company's decision if they dont want to?will it be my right now to ask for NOC?what can i do? pls help me..
Comment by Part Time Work, 27th December, 2008
Part Time is very popular in this century. So, i have some info about part time job, part time for students and more that i could be able to share with you about part time if you have it:D
I'm very appreciate if you are willing to visit my website and share to others, its also nice to know you here. Anyway, have a good day. Well, you had great site here and very good article.:D
Cheers,
Part Time
Comment by QV, 17th December, 2008
Hi Anzarali - this is for comments, check out the forum for discussion and questions.
Comment by anzarali, 17th December, 2008
i was wprking here in catering company as a accountant.i have here good opertunity in other company.now my sponcer is my company,if exit from here.can come agin here within 1 month ,plz give me a answer 4 dis
Comment by Filipino, 5th December, 2008
I have been working on this MEP company, and we are working 9 1/2 hours a day, though we are paid for an overtime which is only 280 riyals FIXED OT everymonth.. for an equivalent of 62 hours /month on Overtime. Does this complies with the Labor Law? and we are also required to work 2 fridays everymonth for 3 hours to compensate the 1/2 hours everyday on OT since we only work 9 1/2 hours.
Comment by siyad, 25th November, 2008
i am working in one electro mechanical company at last 2 years. now i got job offer from kahra-maa electricity.
my company will not give NOC. Any chance to change my sponsership to kahra-maa
Comment by ocw, 20th November, 2008
IM ON MY 12MOS IN MY COMPANY,MY CONTRACT IS UNLIMITED..I ALREADY FILED MY RESIGNATION TO OUR HR DEPT, AND I ALREADY GIVEN THEM 2MOS NOTICE PRIOR TO MY 12MOS OF STAY WITH THE COMPANY..STILL THEY WONT LET ME GO..WATS THE BEST THING TO DO SO DAT I CAN GO BACK HOME?? PLS REPLY..
Comment by OCW, 17th November, 2008
Regarding hours of work stated in the labor code .. During Ramadan we are obliged to work from 9am to 3pm straight and go back and start 7:30pm to 11:00pm in the evening.. after two weeks during the Ramadan ... the schedule changed and starts 7:00am to 3:00pm and return after break 7:00pm up to 12:00am ... and we did not receive any overtime pay during this period ... It is very obvious that we are working over time and according to labor law of Qatar, employees are allowed to work only 6 hours a day during Ramadan.. and for ordinary days our company is still making us go to work for 12 hours ... is there any thing we can do to stop this abuse??? Thanks…
Comment by raja, 17th November, 2008
i have beeb recruited as an accountant under hevey vehicle deiver visa and working since end june 2008 . my visa was notregularised till early November 2008 and no contracts were given for me to sign. I am not satisfied with the salaey and work setup here and i decided to go back to my homeland.I informed this to my employer and then he said first he must prepared my ID and he will let me go. last week he wanted me to sign the Id application and a contract paper. He said unless this is signed he will not allow me to go. Now still i did not receive my ID or Contact copy and i am in very urgent to go back to my country. Please advise me.
Comment by sankarraj, 16th November, 2008
i have been working in qatar for 1 year & 8 months . my visa going to expire on march 09 . due to some personal reason i want to resign my job . if my visa get cancelled , how many years ban period will be imposed on me? whetere one month notice period will be enough
?
Comment by Qatar Visitor, 9th November, 2008
HI Ajith - you should take this to the labour department on C ring road, or alternatively contact your Embasssy. Please note that we normally only answer questions on the forum.
Comment by ajith simon, 8th November, 2008
I am join a company february 10, now I resigned from my company becouse now office is basement 4,there is no fresh air system & our working time is 12hrs with out over time. Now I am facing health problem and I ahve exam in I ndia december 6&7.I Resigned from 30 october 2008, till now company hr telling they did not accept my resignation. Can I go december 1st. I hope you will be give replay
Comment by Amir, 7th November, 2008
MY COMPANY IS SUMBITED MY PASSPORT FOR LABOUR DEPARTMENT AND IT IS REJECTED, WHILE I WAS IN MY FATHERS UNDER & IT IS MY FIRST TIM I M CHANGING MY SPONSER. IT IS GOING TO BE 2 N HALF MONTH. CAN U PLEASE TELL ME WHAT IS GOING ON. CAN U HELP ME.
THANK YOU!
Comment by FARAH YOOSUF, 25th October, 2008
I COMPLETE MY CONTRACT PERIOD NEXT MONTH,AND I LIKE TO LEAV TO MOTHERLAND,I WANT TO COME AGAIN TO QATAR.CAN I COME WITH IN ONE WEEK WHEN I RETUN FROM HERE?NEED ANY DOCUMENT FOR NEW VISA FROM PRIOR COMPANY?
Comment by anonymous, 22nd October, 2008
I want to change company.I've been working with the company for almost 2 years now.Is it possible that my current company will give me release?
Comment by Admin, 16th October, 2008
You can ask for an NOC but you won't necessarily get it. If you have been working for two years for a company and you have a NOC you can change jobs, otherwise you usually can't.
Comment by anonymous, 16th October, 2008
I want to change job as I'm not happy with the current job. It is just 3 months I've joined the company under company's sponsorship. Can I work for another company with a NOC from current sponsor?
Comment by Ahmed, 14th October, 2008
Is it my rights to ask for a NOC(No Objection Certificate)from my present employer, As i was previously on father sponsership at the time of joining the company I had changed my sponsership, Now after completing 2yrs in my present organization Do I have right to ask for a release?
Comment by Ahmed, 14th October, 2008
Is it my rights to ask for a NOC(No Objection Certificate)from my present employer, As i was previously on father sponsership at the time of joining the company I had changed my sponsership, Now after completing 2yrs in my present organization Do I have right to ask for a release?
Comment by Admin, 8th September, 2008
It is certainly treated like a right - i.e. Employers hand it out if they feel like it.
|
|
|